BHEL market share in India

BHEL manufactured and supplied the complete turbine generator machine and steam generating machines for the Kaga Atomic Power Station (KAPS) of the Indian Atomic Energy Corporation (NPCIL).

This ‘pressure-heavy water reactor’ (PHWR) has been operating continuously for the longest period in the entire world. This unit is continuously producing power since May 13, 2016, while the previous record was detained by Pickering Nuclear Generating Station (PNGS) in Canada (894 days).

In the first phase of the country’s nuclear energy program, 18 PHWRs are in operation. BHEL-supplied steam turbine generator set to 12 of them, which indicates a 74 percent share in total nuclear power generation (10 units of 220-220 MW and two units of 540 MW).

Arnaud Lefevre

Arnaud Lefevre

Arnaud Lefevre is the Chief Executive Officer of Dynatom International. Arnaud is in charge of the international development of the business portfolio.
0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments

Don’t Stop Here

laptop, office, hand

Talks between Siemens Energy and Shenzhen Energy

Karim Amin, Executive Vice President of Siemens Energy AG, led a team to visit Shenzhen Energy. Li Yingfeng, Chairman of the Group, warmly received the guests, and the two sides held a discussion on further deepening cooperation.

Beginning of the construction in Akkuyu

Rosatom plans to start construction of the Akkuyu project this summer. Rosatom announced that the necessary documents for the initiation of nuclear plant operations will

Scroll to Top