Huaneng HTGR construction back on fast track in 2020

Facing the “second half” battle to contain the coronavirus pandemic, Huaneng Shidaowan Co., Ltd. accurately implemented policies to resume production. Now it has entered the fast lane. The construction of high-tech gas-cooled reactor demonstration project, which is the major national science and technology project, has been rolled out.

The first important annual task of production resumption is to connect the nuclear island reactors, steam generators, and hot gas ducts to form a primary loop system for nuclear fuel energy conversion, forming a second barrier to prevent the leakage of radioactive materials. On March 10, the East China Nuclear and Radiation Safety Supervision Office released the “before installation of hot gas duct” control point, and the equipment connection work was officially implemented.

2020 is the “year of tackling difficulties” in the demonstration project of high-temperature gas-cooled reactors. The tasks of the project construction are arduous and full of difficulties and challenges.

Elaine Li

Elaine Li

Elaine Li (李益楠) is Marketing Manager for the Chinese Market. With ten years of experience in the nuclear power market, Elaine is experts for the certification of safety equipment (HAF 604 and 601) and marketing intelligence.
0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments

Don’t Stop Here

Liu Baohua at the G20

On June 14-15, G20 Energy Ministers’ Meeting of2018 was held in Bariloche, Argentina. Liu Baohua, Deputy Director of National Energy Administration, attended the meeting and

Scroll to Top