Incident in Taiwan Nuclear Power Plant One

According to Taiwan news, the consecutive deluge destroyed the electric tower of Taiwan Power Plant One. The unit shut down automatically after the tower collapsed.

 

The spokesman of the plant stated that, due to the collapse of the 345KV electricity transmit tower, the Unit 2 cannot send out any electricity and was totally shut down. However, there is no failure in the electric generator and the reactor core. At this moment, the plant is removing the troubles and studying the alternative solutions for the power supply.

 

The statistics shows that the Unit 2 of the Plant One in Taiwan maintains the operation with 75% of the power till June 11. After that time, it will probably shut down and be overhauled as it has no fuel to reload. Besides, the fuel pool is almost packed.

 

Elaine Li

Elaine Li

Elaine Li (李益楠) is Marketing Manager for the Chinese Market. With ten years of experience in the nuclear power market, Elaine is experts for the certification of safety equipment (HAF 604 and 601) and marketing intelligence.
0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments

Don’t Stop Here

Nuclear education in North Africa

Morocco and Tunisia, which also plan to build nuclear power plants signed in 2015 a cooperation agreement in the fields of scientific research for nuclear

Rosatom’s web in India

On 20th October 2016 the Russian firm opened its regional center in Mumbai to supervise its ongoing projects and expand Rosatom’s web in India and Bangladesh. The

Scroll to Top